A good sample proves a factory can make your product once. It does not prove the factory can make thousands of them to the same standard by your deadline. That gap—between “can make it” and “can deliver it”—is what a factory capability assessment is for.
What is a factory capability assessment?
A factory capability assessment evaluates whether a supplier can produce your product to specification, at your required volume and within your timeline. It examines equipment, available capacity, workforce, materials, quality controls and subcontracting, then tests the quoted lead time against evidence. It is one part of a broader factory audit and should follow basic Chinese supplier verification.
Capability vs capacity: two different questions
| Capability | Capacity |
|---|---|
| Can the factory make my product to specification? | How many can it make, and by when? |
| Evidence: process knowledge, suitable equipment, tooling, technical staff, quality controls and approved samples. | Evidence: machine count, cycle times, shifts, current workload and workforce. |
| Failure: product never meets specification. | Failure: product meets specification but arrives late or in partial shipments. |
A factory can be capable but have no free capacity in your production window. A large factory can have spare capacity but lack the process your product requires.
How to estimate production capacity
Do not rely only on “How many can you make per month?” Build an estimate from observable inputs.
Available daily capacity = relevant machines or lines × output per hour × productive hours per day × efficiency factor × share of capacity not already booked.
Production days needed = order quantity ÷ (available daily capacity × expected good-output rate).
For a moulded part, output per hour = 3,600 ÷ cycle time in seconds × number of mould cavities. Productive hours exclude breaks, changeovers and maintenance. The efficiency factor accounts for stoppages; the unbooked share accounts for other customers’ orders.
Illustrative example: moulded plastic parts
Assume two suitable machines, a 30-second cycle, two cavities, 20 productive hours per day, 85% efficiency, 50% unbooked capacity and a 97% good-output rate. Each machine produces 240 parts per hour. Available daily capacity is 2 × 240 × 20 × 0.85 × 0.5 = 4,080 parts. Good output is about 3,958 parts per day. A 50,000-piece order therefore needs roughly 13 working days of moulding. These are illustrative assumptions, not industry benchmarks.
Repeat the calculation for assembly, finishing and packing. The slowest step is the bottleneck and determines real throughput.
Which equipment matters?
Check equipment that can actually run your product—not the factory’s total machine count. For injection moulding, confirm tonnage, shot size, mould maintenance and material drying. For garments, check machine types, cutting and finishing. For electronics, look at SMT lines and functional test stations. For metal parts, verify CNC, stamping, welding and surface treatment. For packaging, check press capacity, die-cutting, lamination and gluing.
Also review calibrated measuring equipment, maintenance capability and material storage. For custom moulds, see the custom tooling and injection mould development process.
People, materials and subcontracting
Count operators on the relevant line rather than total headcount. Identify the engineer or production manager responsible for your order. Ask where key materials come from and how long they take to arrive. List every subcontracted step, the subcontractor and who controls quality. Outsourcing a specialist process is not automatically a problem; undisclosed outsourcing of the core process is.
Check whether the factory has made similar products and whether it can show evidence without revealing another customer’s confidential information. Compare the supplier’s model with our guide to trading companies vs factories.
How to test a promised lead time
- Request a breakdown for materials, tooling or setup, production, finishing, packing and inspection.
- Confirm the actual production start date, not just the number of production days.
- Ask to see the schedule for the lines that would make your order.
- Compare the schedule with your own capacity estimate.
- Ask how long the last similar order took and what caused delays.
- Agree milestone dates for materials received, first output and packing complete.
Order size also affects scheduling and minimums. Our guide to MOQ and how it is set explains why small runs may wait behind larger orders.
Capability assessment checklist
- The core process is performed in-house, or subcontracting is fully disclosed.
- Suitable machines are present, working and identified by nameplate.
- Cycle times and output rates are plausible.
- Free capacity exists in your production window.
- Lead time is broken into stages.
- A named technical owner and operators are assigned.
- Materials, subcontractors and test equipment are documented.
- In-process and final quality checks are recorded.
- Seasonal constraints are reflected in the schedule.
For broader legal, workforce and safety checks, use the China factory audit checklist.
Remote or on-site?
A video call can show machine nameplates, production schedules and some process steps. Judging true scale, idle capacity and subcontracting is usually more reliable in person. Our remote supplier verification guide explains what video checks can and cannot establish. If you plan to travel, use our factory visit checklist.
Red flags in capacity claims
- The supplier quotes very high monthly output but cannot identify the machines or lines.
- Lead time is identical regardless of order size or season.
- The production area for your product type cannot be shown.
- The supplier promises an immediate start despite a visibly busy factory.
- Core processes are revealed to be outsourced only after direct questioning.
See also our guide to Chinese supplier red flags.
For Bangladesh importers
For seasonal stock such as Eid demand, ask for a lead time ending when goods are ready for loading. Add freight and customs-clearance assumptions from your forwarder and C&F agent; production delays compound with transit time. See our China-to-Bangladesh shipping guide.
How Jingxin Sourcing helps
Jingxin Sourcing carries out supplier-verification checks including business licence, registration, factory-versus-trading-company status, address, certifications and bank-account verification. Its staff conduct physical factory audits in Yiwu, Shenzhen and Guangzhou, and the company negotiates MOQ, price, lead time and payment terms. For an on-site assessment, visit our factory audit and supplier assessment service. For earlier-stage supplier mapping, see product research.
Frequently Asked Questions
How do I estimate monthly capacity?
Multiply suitable machines by hourly output, productive hours, efficiency and working days, then reduce for capacity already booked and expected scrap.
What is a realistic efficiency factor?
It varies by process and factory. Ask for the factory’s figure and sense-check it against observed stoppages and changeovers.
Should I worry about subcontracting?
Not automatically. The concern is undisclosed subcontracting, especially of the core process, because it affects quality and lead time.
How can I test a lead-time promise?
Ask for a stage-by-stage breakdown, confirm the start date, review the production schedule and compare it with your own capacity estimate.
Does a bigger factory mean more reliable delivery?
No. Available capacity on suitable lines during your production window matters more than total factory size.
Summing up
Treat capacity claims as hypotheses. Build your own estimate from machines, cycle times, hours and existing workload; identify the bottleneck; break the lead time into stages; and ask for evidence of similar orders. A supplier whose answers survive that scrutiny is more likely to deliver what the sample promised. For the next steps, see our factory visit checklist and pre-shipment inspection guide.